7th May 2025

95% efficient hot water upgrade for Jubilee Court Care Home – Zero downtime during full system overhaul

Article by: Ryan Greaves
See all case studies

Ecotech Yorkshire delivered a major upgrade for Jubilee Court Care Home’s Gas hot water storage system, increasing energy efficiency from 68% to 95% with a new Lochinvar installation, all while maintaining uninterrupted hot water access throughout.

A future-proofed solution for growing demand

As the care home expanded, so did its hot water requirements. Ecotech Yorkshire installed larger, high-efficiency gas-fired water heaters alongside a custom water filtration and softening system, essential for performance in this hard water area.

Jubilee Court Care Home

Major system upgrade with zero operational downtime

To ensure residents experienced no disruption, the team kept the old system running while relocating and installing the new water heaters, flue system, and upgraded gas supply on the opposite side of the building, ensuring a seamless transition and compliance.

Key challenges and how we overcame them

As mentioned, one of the biggest challenges was maintaining uninterrupted hot water supply in a live care environment, where downtime simply wasn't an option. We overcame this by carefully sequencing the installation, leaving the existing system fully operational while relocating and installing the new water heaters and flue system on the opposite side of the building. We also upgraded the gas supply to meet higher demand and added a water softener to address hard water conditions. Coordination and timing were critical, and we ensured residents and staff were never affected during the switchover.

High-efficiency hot water system achieved

Jubilee Court Care Home now benefits from a significantly more efficient and robust hot water system, tailored to support its expanding capacity and higher daily demand. By upgrading from a 68% to a 95% efficiency rating and incorporating a water softener to combat local hard water, the system ensures reduced energy use, improved reliability, and lower running costs. Most importantly, these improvements were delivered with zero disruption to care services, safeguarding resident comfort throughout the transition.

Project value: £55,000

Find out more about

Boiler Installations
Ryan Greaves

To find out more or get a quote, get in touch with our expert Ecotech Yorkshire Team.

[hidden][hidden]

Trusted suppliers and partners

  • Worcester Bosch Group
    Bosch
    Ambirad
    Combat
  • Schwank
    Viessman
    Ideal Boilers
    Powrmatic
  • Riello
    Fujitsu
    Mitsubishi Electric
    Daikin
Call for a free quote

Sign up today to receive exclusive offers

Trusted suppliers and partners

  • Worcester Bosch Group
  • Bosch
  • Ambirad
Ecotech BuildingLogos
Ecotech

Find us

Aizlewood’s Mill Nursery Street,
Sheffield,
S3 8GG

01144 000454
hello@ecotechyorkshire.co.uk

Price Promise

Price Promise

We promise offer all our customers the best possible price with no compromise on quality of service.

All Rights Reserved. Company No: 07974760 | Designed by Rawww

ECOTECH PLUMBING & HEATING (SY) LTD (FRN 1034302) is an Introducer Appointed Representative of Tradehelp Ltd, who are authorised and regulated by the Financial Conduct Authority (FRN 697812). ECOTECH PLUMBING & HEATING (SY) LTD introduce customers to TradeHelp Ltd for the purpose of credit broking only and do not receive a fee for the introduction. TradeHelp Ltd are a credit broker, not a lender, and offer loans from Novuna Personal Finance, a trading style of Mitsubishi HC Capital UK PLC authorised and regulated by Financial Conduct Authority. Finance options are offered subject to status and credit check, which must be completed before commencement of works. A 14 day cooling off period applies to all applications. If cancelled within 14 days, alternative payment of the full outstanding balance must be made.

©2026 copyright Ecotech Yorkshire
crossmenu