Installing air conditioning / HVAC for the Freightliner Group Ltd’s office building and achieving COP of 3.6

Article by: 

Ecotech Yorkshire partnered with Freightliner Group Ltd to deliver heat pump office building support, providing a complete air conditioning fit-out for their newly refurbished 8,000 sq. ft. training academy, situated in the heart of the Frenchgate Shopping Centre. The client required a modern, efficient HVAC solution that could support operations without disrupting the academy’s activities or the shopping centre environment.

Air conditioning design and installation

We firstly started by installing the latest Mitsubishi Electric VRF City Multi heat pumps into their office buildings (67kW total output), delivering zoned, energy-efficient climate control across the large open-plan space.

air source heat pump

A convenient control system & plumbing elevations

As part of this project, we integrated BC Controller for independent control of all 13 indoor units, which included a combination of wall-mounted and ceiling cassette types, all with remote access for ease of use and energy management. As part of the supplementary plumbing works, we installed a wash basin for the newly created on-site health check room too.

air source heat pump

Key challenges and how we overcame them

The academy had to remain fully operational during installation. We meticulously scheduled works and coordinated deliveries to ensure minimal disruption. A major logistical challenge involved transporting the 450kg external office building heat pump units to the shopping centre roof without using cranes. This was achieved by disassembling the units, manually transporting them to the roof, and then rebuilding them on-site, an effort that showcased our resourcefulness and commitment to our client's requirements.

air source heat pump

High-efficiency climate control achieved

Freightliner Group Ltd now has a remote-controlled, zoned air conditioning system which significantly reduces energy use and running costs. We’ve also helped them transition from a fixed ducted system to a flexible, room-by-room approach. When you look at the numbers, their COP (Coefficient of Performance) of 3.6, for every 1kW of input, 3.6kW of heat output has now been achieved, marking a significant gain in efficiency too.

This article is general guidance, not legal or technical advice for any specific building. Regulations and official guidance change, and requirements depend on your premises, equipment and circumstances, so check the current position and take advice from a suitably qualified professional before acting. If you notice anything that appears out of date, please let us know.

Trusted suppliers and partners

Combat
Ambirad
Bosch
Schwank
Viessmann
Ideal Boilers
Powrmatic
Worcester Bosch Group
Riello
Fujitsu
Daikin
Mitsubishi Electric

Ready to get started? We'll give you a straight answer and a fair price.

Request HVAC Quote

We've been keeping homes and businesses warm — and cool — across Yorkshire since 2012.

Ecotech are commercial HVAC engineers, Gas Safe and F-Gas certified, trading across Yorkshire since 2012. We deliver installation, maintenance and compliance work for offices, education, manufacturing, medical, retail and hospitality clients — backed by REFCOM and Constructionline Gold accreditation — alongside domestic heating and plumbing services.

Logos

All Rights Reserved. Company No: 07974760 | Marketing by Rostone Operations

©2026 copyright Ecotech Yorkshire
crossmenu linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram